LIST OF MAJOR COMPLETED STRUCTURAL STEEL PROJECTS AND WORK-IN-PROGRESS AS AT 31 MARCH 2004
|
| Borneo Pulp & Paper Sdn Bhd |
The Design, Construction And Completion Of The Proposed Diesel Generation House At The Pulp Mill At Tatau, Bintulu, Sarawak. - 30 Apr 1999 |
| Eterbina Sdn Bhd |
SuperStructural Works for The Proposed Construction And Completion of The Out-Patient Department Building At Normah Medical Specialist Centre - 27 Oct 1998
|
| Perbena Emas Sdn Bhd |
The Construction And Completion of The Proposed Mukah Water Supply Raw Water Resource Development, Phase I, Mukah District, Sibu Division, Sarawak - 15 Feb 2001 |
| Walter Group International-IJM Joint Venture |
1st Silicon Semiconductor Project, Kuching, Sarawak - Process Utility Pipe Racks To (Part) Fab Building Package No. 2SC-P-F27. - 27 June 2000 |
| M+W Zander (M) Sdn Bhd |
1st Silicon Semiconductor Project, Kuching, Sarawak - Eguipment Base Frame For 10K Phase - Nov 2001 |
| Nishimatsu Construction |
Proposed Factory Buildings Phase IV for Taiyo Yuden (S) Sdn Bhd - Structural Steel Works & Secondary Structure For Factory 6 & 7. - 30 Dec 2000 |
| JMSB-KMSB-SIME Consortium |
Supply & Fabrication of Platforms, Ladders & Pipe Supports For Malaysia LNG Tiga Project - 31 Oct 2001 |
| Nichias Corporation |
Supply & Fabrication of Bearing Plates & Shoe For Malaysia LNG Tiga Project - 14 Jan 2002 |
| Jayalah Cemerlang Realty Sdn Bhd |
Fabrication, Supply, Delivery, Installation And Completion Of The Steel Structure System For The Proposed 12-Storey Office Cum VIP Resthouse Complex, Mukah, Sarawak - 25 June 2003 |
| Chang Tze Brothers Construction Sdn Bhd |
Fabrication, Supply, Delivery, Installation And Completion of The Steel Structure System On Main Building And Coal Shed For Sejingkat 2x55MW Coal-Fired Power Plant Phase II - 11 Oct |
| Argonaut S.EA. Pte Ltd |
Supply of Platform & Ladder for Flare Gas And Hydrogen Recovery System Project, Pertamina, Indonesia (SGD49,500) - 30 Sept 2003 |
| Zecon Engineering Works Sdn Bhd |
Proposed Structural Steel Works for UNIMAS Development Project, Stage of Phase 1 - Chancellery & University House (CAUH) Building - IN progress (85%) |
LIST OF MAJOR COMPLETED TRANSMISSION LINE PROJECTS AND WORK-IN-PROGRESS AS AT 31 MARCH 2004
|
| Sarawak Electricity Supply Corporation |
- 33kV Line Turn-In To Medan Jaya Substation, Bintulu Division - 25 June 1999
- 33kV Line Restoration Works, Kemena, Bintulu - 31 May 1999
- 132kV Oya-Bukit Lime Transmission Line. - 4 May 2001
- 33kV Lundu-Sematan Overhead Line Extension. - 11 June 2001
- 132kV Matang-Batu Kawa Transmission Line. - 31 July 2002
- 33kV Mambong-Serian Transmission Line - In progress (99%)
- Design, Supply, Transportation And Erection of steel Pole At Lot 2978, Jalan Tun Jugah, Kuching - 23 Dec 2002
|
| Transmission Technology Sdn.Bhd. |
- Construction of 500kV Transmission Line From Ayer Tower Substation To TNB Janamanjung Power Station, Perak - 28 Feb 2001
- Supply of HDG Tower Members for 500kV Line 6 Replacement, Johore.- 26 Jan 2001
- 500kV Transmission System Development - Tower Erection Work For Line 5 & Line 6, Johore. - 22 Oct 2001
|
| Sarwaja Engineering & Construction |
33kV Kemena-Bintulu New Airport Transmission Line using monopoles - 31 July 2002 |
LIST OF MAJOR COMPLETED TELECOMMUNICATION TOWER PROJECTS AND WORK-IN-PROGRESS AS AT 31 MARCH 2004
|
| Telekom Malaysia Berhad |
- Supply of 300ft & 400ft Broadcasting Tower - May 1999 Design, Fabricate & Delivery of Modified Top Portion of TV Tower for TMB at Bukit Trigg in Sabah - 29 Aug 2002
|
| Ericsson Telecom. Inc Philippines |
Design & Supply of 10 units of Microwave Tower - June 2000 |
| Globe Communication Inc. Philippines |
Design & Supply of 30m Aesthetic Tower - Oct 2000 |
| Nextel Communication Inc. Philippines |
Design & Supply of 35m & 45m Microwave Towers - Feb 2001 |
| DiGi Telecommunications Sdn Bhd |
Full Turnkey for the Supply, Delivery and Installation of One Unit of 200ft Medium Duty Tower At Site No. 90307 Unimas, Kota Semarahan, Kuching - 26 Aug 2002 |
| MG EXEO Network, Inc. Philippines |
Supply of 30 Units Microwave Tower For Globe/Ericsson Phase 8B Project - 28 Aug 2002 |
| Instacom Engineering Sdn.Bhd. |
Supply of 1 unit 350ft Heavy Duty Telecommunication Tower - 30 Nov 2002 |
| SACOFA Sdn. Bhd. |
- Design, Manufacture & Supply of 3 Units of 200ft Heavy Duty Tower - 30 Nov 2002
- Design & Supply of SS Tower - 29 July 2003
- 200ft HD - 1 unit
- 250ft HD - 1 unit
- Design & Supply of SS Tower - 16 Oct 2003
- 200ft HD - 3 units
- 150ft HD - 1 unit
|
| MG EXEO Network, Inc. Philippines |
- Design & Supply of 4 units 4-Legged SS Tower for Globe/Ericsson Phase 9 Project - 14 Aug 2003
|
LIST OF MAJOR TOWER/POLE TESTS COMPLETED
|
| 1. Zelleco Engineering Sdn. Bhd., Malaysia |
- Tower test for Tower Type Ô345SL+6Õ of the 275kV Transmission Line from Tuanku Jaafar Power Station to Olak Lampik Substation Ð Aug 2003
|
| 2. M-IO Builder Sdn. Bhd., Malaysia |
- Tower Supply & Tower Test for Tower Type Ô23L+9Õ of the TNB Standard 132kV Suspension Transmission Tower Ð Dec 2003
|
| 3. M-IO Builders Sdn. Bhd., Malaysia |
- Tower Supply & Tower Test for Tower Type Ô23M+6Õ of the TNB Standard 132kV Tension Transmission Tower Ð March 2004
|